Brewhouse, complete breweryVerschiedene
Brauerei mit Lagertanks, Abfüllung ...
Brewhouse, complete brewery
Verschiedene
Brauerei mit Lagertanks, Abfüllung ...
Vaste prijs excl. btw
€ 100.000
Bouwjaar
2026
Toestand
Gebruikt
(volledig functioneel)
Locatie
Meerbusch 

Basisgegevens
- Machinetype:
- Brewhouse, complete brewery
- Producent:
- Verschiedene
- Bouwjaar:
- 2026
- Toestand:
- uitstekend (gebruikt)
- Functionaliteit:
- volledig functioneel
Prijs & locatie
Vaste prijs excl. btw
€ 100.000
- Locatie:
- Meerbusch, Duitsland

Bellen
Technische details
Wandmateriaal:
roestvrij staal
Details over het aanbod
- Advertentie-ID:
- A232-89645
- Laatste aanpassing:
- voor het laatst op 05.11.2026
Omschrijving
We offer a very good brewery with fermentation tanks, bottling line, brewing house, and complete brewery equipment, manufactured between 2016 and 2024.
Manufacturer: Various
If you have any questions or require further information, please feel free to send us a message or call us.
General Information
• Location of the plant: Cormento GmbH, Berta Benz Strasse 2, 40670 Meerbusch, Germany
• Year of construction of the main components: 2016
• Condition: very well maintained
• Previous owner: Cormento GmbH
Technical Data
• Batch size per brew: 6 HL net wort
• Maximum brews per day: 2
• Brewing time per batch: approx. 6–7 hours
• Space requirement: approx. 50-70 m²
• Power consumption: approx. 12 kWh
• Personnel requirement: 1 person
Brewing House (year of construction 2016)
• Malt mill: Sommer/BRD, capacity 1,100 kg/h
• Mashing and brewing kettle: Prinz Ludwig Brau/BRD/China, stainless steel, batch size 6 HL, temperature probes, shut-off valves, spray heads for CIP
• Lauter tun & whirlpool: stainless steel, frequency-controlled drive, removable bottom, temperature probes, spray heads
• Wort cooler: stainless steel, cooling with cold and ice water
• Accessories: valves, pipelines, agitator, pumps, automatic brewing house control system with PLC
• Steam generator: 13–55 kg steam/h up to 110°C, 36 kW
• CIP system: available
Fermentation/Storage Cellar
• 5 x fermentation and storage tanks (Uni Tank ZKG) China: stainless steel, useful capacity 6 HL net each, pressure 2 bar, insulation 100 mm, 2 jacket cooling, airlock, spray head, 1 temperature sensor, height 2,300 mm
• 3 x fermentation and storage tanks (Uni Tank ZKG) China: stainless steel, useful capacity 12 HL net each, pressure 2 bar, insulation 100 mm, 2 jacket cooling, airlock, spray head, 2 temperature sensors, height 3,520 mm, year of construction 2024
• Cooling system: glycol, cooling temperature -5°C, thermostat control
• Ice water tank: 800 l
• Accessories: temperature control, piping, cooling unit
Bottle Filling
• Fillmore Packing Solutions USA
• FB4-4C X6 Series Year of construction 2020: According to the manufacturer, up to 600 bottles per hour, set up for long-neck 0.33 l, long-neck 0.5 l, and Belgian beer bottles 0.75 l. The operation is semi-automatic.
Bottle Cleaning
• Asta: The system was completely overhauled by the manufacturer in 2020 and converted from milk bottles to beer bottles and set up for long-neck 0.33 l, long-neck 0.5 l, and Belgian beer bottles 0.75 l.
• Ebatec Jemi: Universal bottle washing machine, year of construction 2022
• Soaking wheel: can be heated
Chodpfx Aj Ah D Hqeblsd
Filtration
• Seitz: Orion, year of construction 1979, very robust and heavy design
Open Fermentation Tank
• Open fermentation tank: Former milk tank with agitator and bottom cooling
CIP System
• CIP system
Additional Information
• Delivery conditions: Ex brewery Meerbusch
• Dismantling, transport, and installation: Costs and organization are the responsibility of the buyer
• Warranty: No warranty, warranty excluded
De advertentie werd automatisch vertaald. Vertaalfouten zijn mogelijk.
Manufacturer: Various
If you have any questions or require further information, please feel free to send us a message or call us.
General Information
• Location of the plant: Cormento GmbH, Berta Benz Strasse 2, 40670 Meerbusch, Germany
• Year of construction of the main components: 2016
• Condition: very well maintained
• Previous owner: Cormento GmbH
Technical Data
• Batch size per brew: 6 HL net wort
• Maximum brews per day: 2
• Brewing time per batch: approx. 6–7 hours
• Space requirement: approx. 50-70 m²
• Power consumption: approx. 12 kWh
• Personnel requirement: 1 person
Brewing House (year of construction 2016)
• Malt mill: Sommer/BRD, capacity 1,100 kg/h
• Mashing and brewing kettle: Prinz Ludwig Brau/BRD/China, stainless steel, batch size 6 HL, temperature probes, shut-off valves, spray heads for CIP
• Lauter tun & whirlpool: stainless steel, frequency-controlled drive, removable bottom, temperature probes, spray heads
• Wort cooler: stainless steel, cooling with cold and ice water
• Accessories: valves, pipelines, agitator, pumps, automatic brewing house control system with PLC
• Steam generator: 13–55 kg steam/h up to 110°C, 36 kW
• CIP system: available
Fermentation/Storage Cellar
• 5 x fermentation and storage tanks (Uni Tank ZKG) China: stainless steel, useful capacity 6 HL net each, pressure 2 bar, insulation 100 mm, 2 jacket cooling, airlock, spray head, 1 temperature sensor, height 2,300 mm
• 3 x fermentation and storage tanks (Uni Tank ZKG) China: stainless steel, useful capacity 12 HL net each, pressure 2 bar, insulation 100 mm, 2 jacket cooling, airlock, spray head, 2 temperature sensors, height 3,520 mm, year of construction 2024
• Cooling system: glycol, cooling temperature -5°C, thermostat control
• Ice water tank: 800 l
• Accessories: temperature control, piping, cooling unit
Bottle Filling
• Fillmore Packing Solutions USA
• FB4-4C X6 Series Year of construction 2020: According to the manufacturer, up to 600 bottles per hour, set up for long-neck 0.33 l, long-neck 0.5 l, and Belgian beer bottles 0.75 l. The operation is semi-automatic.
Bottle Cleaning
• Asta: The system was completely overhauled by the manufacturer in 2020 and converted from milk bottles to beer bottles and set up for long-neck 0.33 l, long-neck 0.5 l, and Belgian beer bottles 0.75 l.
• Ebatec Jemi: Universal bottle washing machine, year of construction 2022
• Soaking wheel: can be heated
Chodpfx Aj Ah D Hqeblsd
Filtration
• Seitz: Orion, year of construction 1979, very robust and heavy design
Open Fermentation Tank
• Open fermentation tank: Former milk tank with agitator and bottom cooling
CIP System
• CIP system
Additional Information
• Delivery conditions: Ex brewery Meerbusch
• Dismantling, transport, and installation: Costs and organization are the responsibility of the buyer
• Warranty: No warranty, warranty excluded
De advertentie werd automatisch vertaald. Vertaalfouten zijn mogelijk.
Aanbieder
Opmerking: Registreer gratis of log in, om alle informatie te bekijken.
Laatst online: Gisteren
Geregistreerd sinds: 2026
1 advertentie online
Aanvraag sturen
Telefoon & Fax
+49 163 7... weergeven
Uw advertentie is succesvol verwijderd
Er is een fout opgetreden








































